PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed rebar inside the couplers around the 4th Floor Facing South-East  (800x600).jpg Metal decking at half of Derricks 4 - 5 (Roof) Facing East (800x600).jpg Poured concrete at Stairs -4 Facing East (800x600).jpg Started installing duct work hangers at the 2nd floor Facing South (800x600).jpg Started installing wire mesh at the 3rd floor Facing North-East (800x600).jpg Started repairing the interior concrete stairwell -5 (800x600).jpg Continued layout for the interior framing at the 2nd Floor Facing North (800x600).jpg Installed pour stops around the elevator 1,2,3 shaft (2nd Floor) Facing South-West (800x600).jpg Poured concrete at the slab on grade column diamonds Facing South (800x600).jpg
Previous pageNext page Started installing wire mesh at the 3rd floor Facing North-East (800x600)
Started installing wire mesh at the 3rd floor Facing North-East (800x600)